0%
GWH_Darby_Plaza_Commercial_Office_Building_2000x1013 (1)
GWH_Darby_Plaza_Commercial_Office_Building_2000x1013 (1)
  • Commercial
  • Completed

Darby Plaza

Darby Plaza is a seven-storey A-Grade commercial development delivered by GWH to bring a disused section of the former Newcastle rail corridor back to life as a connected workplace and lifestyle destination.

Located between Darby Street and the Newcastle Foreshore, the development was purposefully designed to support a modern workforce while contributing high-quality public amenity.

Five levels of premium office accommodation totalling approximately 8,000 square metres are complemented by ground-floor retail, an external kiosk café and a generous public plaza that re-establishes a strong pedestrian connection between the city and the harbour. Flexible floorplates, harbour views, informal meeting areas and end-of-trip facilities were integrated to support wellbeing, collaboration and long-term tenant appeal.

Darby Plaza now accommodates a mix of local, national and international tenants and has achieved a 5 Star NABERS energy rating, reflecting GWH’s commitment to sustainable, performance-driven commercial development.

Project
Darby Plaza
Address
352 Hunter Street, Newcastle NSW, Australia
Status
Completed
GWH_Projects_Darby_Plaza_Reception2_2000x1333
GWH_Projects_Darby_Plaza_Reception2_2000x1333
GWH_Darby_Plaza_Commercial_Office_Facade_2000x1330
GWH_Darby_Plaza_Commercial_Office_Facade_2000x1330
GWH_Projects_Darby_Plaza_Chillout_Space_2000x1333
GWH_Projects_Darby_Plaza_Chillout_Space_2000x1333
GWH_Darby_Plaza_Commercial_Office_lobby_2000x1330
GWH_Darby_Plaza_Commercial_Office_lobby_2000x1330
GWH_Projects_Darby_Plaza_Reception1_2000x1333
GWH_Projects_Darby_Plaza_Reception1_2000x1333
GWH_Darby_Plaza_Commercial_Office_end_of_trip_2000x1330
GWH_Darby_Plaza_Commercial_Office_end_of_trip_2000x1330
GWH_Projects_Darby_Plaza_Meeting_Room_2000x1333
GWH_Projects_Darby_Plaza_Meeting_Room_2000x1333
GWH_Projects_Darby_Plaza_Meeting_Space_2000x1333
GWH_Projects_Darby_Plaza_Meeting_Space_2000x1333

Construction was delivered by GWH, and delivered over a 23-month period from July 2020 to June 2022, progressing through a global pandemic while maintaining programme certainty and build quality. The structure is supported by continuous flight auger piles extending up to 14 metres to bedrock, with a precast concrete and post-tensioned suspended slab system forming the primary structure. Precast structural walls, columns and architectural façade panels were supplied by Hunter Precast, while Hunter Windows delivered a custom-engineered strip window system incorporating Low-E glazing to exceed energy-efficiency requirements. The building incorporates a water-cooled VRV air-conditioning system, integrated smart building management systems and rooftop solar generation, collectively targeting reduced operational energy use and emissions. Delivery also required the relocation of major in-ground services, stormwater culverts and electrical infrastructure, demanding disciplined coordination across design and construction to deliver a refined A-Grade commercial asset.

GWH_Projects_Darby_Plaza_Foyer_1080x1363
GWH_Projects_Darby_Plaza_Foyer_1080x1363
GWH_Projects_Darby_Plaza_Kitchen_1080x1363
GWH_Projects_Darby_Plaza_Kitchen_1080x1363
GWH_Darby_Plaza_Commercial_Office_Kiosk_1080x1360
GWH_Darby_Plaza_Commercial_Office_Kiosk_1080x1360
GWH_Darby_Plaza_Commercial_Office_carpark_1080x1360
GWH_Darby_Plaza_Commercial_Office_carpark_1080x1360

Contact

GWH Newcastle

L3 25 Bolton Street
Newcastle, NSW 2300

GWH Thornton

40 Glenwood Drive
Thornton, NSW 2322

Call Us

02 4966 3766

Follow Us

Subscribe

Subscribe to receive our latest news